Identify removal limits
Share the location, drawings and elements to remove or retain.


PMTE Service
Defined removal limits. Coordinated cutting, breaking and clearance.
PMTE · Abu Dhabi · Established 1994
PMTE provides concrete cutting, controlled breaking and asphalt removal in Abu Dhabi as part of defined demolition and site-preparation scopes.
Concrete cutting and concrete demolition address different parts of a removal scope. Cutting defines a separation or opening; breaking and removal address material that is to be taken out. PMTE's capabilities include concrete cutting, controlled breaking and asphalt removal for Abu Dhabi project sites.
A quotation should identify what must be removed and what must remain. Provide drawings or photographs, material details where available, access restrictions and the required condition after removal. Reinforced concrete, nearby structures and site operations affect the proposed sequence and equipment selection.
Wall demolition is recorded at Saadiyat Bridge, while demolition and foundation removal are recorded at Mina Zayed Fisherman's Wharf Phase 1B. These are examples of PMTE's removal experience; the portfolio does not specify a cutting method for either project.
Discuss your project scopePMTE · Services
Share the location, drawings and elements to remove or retain.
Identify adjacent structures, ongoing activities and access constraints for review.
Confirm the cutting, breaking, removal and transport responsibilities before mobilisation.
Include debris handling and the required handover condition in the agreed work scope.
PMTE · Abu Dhabi
Yes. Concrete cutting and asphalt removal are included in PMTE's capabilities. Contact the team with the site location and removal requirements to discuss a defined scope.
Concrete or foundation removal can be coordinated with excavation and site preparation where included in the agreed contract. Confirm which materials must be removed and the required final level.
Send the site location, approximate area, available thickness information, access details and photographs. Specify whether loading, transport and preparation of the underlying area are required.
Send the site location, photographs or drawings, removal or preparation scope, access restrictions and proposed programme. Specify whether equipment, loading, waste transport and site levelling are required.
PMTE · Abu Dhabi
Contact PMTE to discuss the defined scope and site requirements in Abu Dhabi and the UAE.